EPSG systems

EPSG:3318 IGC 1962 / Congo TM zone 12

Projected system (Transverse Mercator) in use: Congo DR (Zaire) - 11°E to 13°E onshore. The full definition below, and conversion in one click.

EPSG publishes no simple transformation to WGS 84 for this datum: conversion works on the ellipsoid alone and can be off by tens of metres.

System record
CodeEPSG:3318
NameIGC 1962 / Congo TM zone 12
TypeProjected system — Transverse Mercator
Area of use Congo DR (Zaire) - 11°E to 13°E onshore
The Democratic Republic of the Congo (Zaire) - onshore west of 13°E.
Bounds W 12,17° · S -6,04° · E 13,01° · N -4,67°
Countries Congo - Kinshasa
DatumIGC 1962 Arc of the 6th Parallel South
Ellipsoid Clarke 1880 (RGS) a = 6378249.145 m · 1/f = 293.465
Base geographic system EPSG:4697 — IGC 1962 6th Parallel South
Unit metre (E east, N north)
Transformation to WGS 84 No simple transformation published (ellipsoid alone)
ScopeCadastre, engineering survey, topographic mapping (medium scale).

Projection parameters

ParameterValueUnit
Latitude of natural origin0degree
Longitude of natural origin12degree
Scale factor at natural origin0.9999unity
False easting500000metre
False northing10000000metre

proj4 definition

+proj=tmerc +lat_0=0 +lon_0=12 +k=0.9999 +x_0=500000 +y_0=10000000 +a=6378249.145 +rf=293.465 +units=m +no_defs

Paste it into QGIS, proj4js, PostGIS (spatial_ref_sys) or GDAL. +towgs84 carries the EPSG transformation to WGS 84; the official code stays EPSG:3318.

WKT (ESRI format, the .prj content)

PROJCS["IGC_1962_Congo_TM_Zone_12",GEOGCS["GCS_IGC_1962_6th_Parallel_South",DATUM["D_IGC_1962_Arc_of_the_6th_Parallel_South",SPHEROID["Clarke_1880_RGS",6378249.145,293.465]],PRIMEM["Greenwich",0.0],UNIT["Degree",0.0174532925199433]],PROJECTION["Transverse_Mercator"],PARAMETER["False_Easting",500000.0],PARAMETER["False_Northing",10000000.0],PARAMETER["Central_Meridian",12.0],PARAMETER["Scale_Factor",0.9999],PARAMETER["Latitude_Of_Origin",0.0],UNIT["Meter",1.0]]

All systems — Congo - Kinshasa

Source: EPSG registry v11.022 (IOGP), through the PROJ database. Always check a code on epsg.org before contractual work.